Post-Removal Method "OK Method"
We can extract any type of pile from the tip! Choose from three types of pile extraction methods tailored to the site.
The "OK Method" is a pile extraction technique that forcibly chucks the tip of the pile using a special casing, allowing for the extraction of existing piles from the tip. It enables proper backfilling simultaneously with the extraction of the pile. As it is a noiseless and vibration-free method, it can be implemented in various locations, including urban areas, office districts, and residential areas. 【Features】 ■ Safe construction ■ Smooth operation ■ Short construction period ■ Noiseless and vibration-free work *For more details, please download the PDF or feel free to contact us.
- Company:岡田組
- Price:Other